From 22 to 26 June 2020, LIFE REWATCH project was present on the Innovative Water Week, organized by Water Europe. LIFE REWATCH had a virtual booth, where information of the project was showed (https://wie-2020.b2match.io/page-2591). Carlos Ramos, researcher from...

read more
1st OPEN DAY REWATCH

1st OPEN DAY REWATCH

On June 16th the LIFE REWATCH project team hosted a virtual open day. The virtual seminar gathered three partners of the LIFE REWATCH project: Miquel Rovira (from Eurecat, coordinator of the project), Elisenda Taberna (from VWS, technology supplier of AnoxKaldnesTM...

read more
Start-up of the pilot plant

Start-up of the pilot plant

Petrochemical industry is a great water consumer sector, producing wastewater with complex composition and at high volumes (around 1,750 millions of m3 per year). In order to introduce the circular economy concept into the petrochemical sector, LIFE-REWATCH project...

read more
The REWATCH consortium meets with the NEEMO monitoring expert

The REWATCH consortium meets with the NEEMO monitoring expert

Last 25th of June 2019 took place the sixth review meeting at DOW North Petrochemical Complex in La Pobla de Mafumet, Tarragona Province, Spain. Representatives of all beneficiaries attended the meeting along with María José de la Torre, the NEEMO expert responsible...

read more
REWATCH project presented at IWA Water Reuse

REWATCH project presented at IWA Water Reuse

Last 16-20 June, REWATCH Project was presented in 12th IWA International Conference on Water Reclamation and Reuse. Verónica Gómez, from Tarragona Global Water Technology Center and R&D Leader in DuPont Water Solutions, presented a poster and an oral presentation...

read more
REWATCH project meeting

REWATCH project meeting

Last 11th of March took place a technical meeting at DOW Chemical Ibérica facilities. Technical aspects of the prototype operation were discussed and currently great efforts are being done to start its operation in a very short time.

read more
REWATCH consortium meets in DOW for its fifth followup meeting

REWATCH consortium meets in DOW for its fifth followup meeting

Last 4th of December 2018 took place the fifth review meeting at DOW facilities in Tarragona. The project consortium reviewed the current status of the project, action by action and visited the REWATCH plant. Just finished the site adaptation and implementation of the...

read more

Rewatch

2021
June 15

PUBLICATION INDUSTRIA QUIMICA

PUBLICATION INDUSTRIA QUIMICA
The results of LIFE REWATCH were published in a technical article ‘Economia circular, también en el sector petroquímico’, in the INDUSTRIA QUÍMICA magazine of February 2020. See https://lnkd.in/eyqWzgS Implementing or improving the treatment and reuse processes of wastewater generated in the petrochemical industry converges to bring the circular economy closer..Read More
May 24

IWA DIGITAL WORLD WATER CONGRESS

IWA DIGITAL WORLD WATER CONGRESS
Between 24th May and 4th June 2021, the results obtained along the operation of the REWATCH pilot plant are presented at the 1st IWA Digital World Water Congress. This is a virtual event, where scientists, academics, engineers and sector thought leaders are covering the full water cycle. In this congress,..Read More
May 13

INTERVIEW MAGAZINE AGUAS RESIDUALES

INTERVIEW MAGAZINE AGUAS RESIDUALES
On May 13, 2021, aguasresiduales.info, a leading magazine in information, training, and knowledge of the Water Treatment Sector, invited Elisenda Taberna to an interview to talk about the LIFE REWATCH project. It can be found in https://www.aguasresiduales.info/media/boletines/boletin-_2021-05-13.html During the interview, topics such as the context of the project, related to..Read More
2020
October 29

2nd OPEN DAY REWATCH

2nd OPEN DAY REWATCH
On 29th October 2020, the LIFE REWATCH project team hosted a virtual event, where the main results obtained along the operation of the REWATCH pilot plant were presented. For this virtual seminar, 4 partners of the REWATCH consortium had the opportunity to present the LIFE REWATCH project: Carlos Ramos, researcher..Read More
June 22

LIFE REWATCH Project was present on the Innovative Water Week

LIFE REWATCH Project was present on the Innovative Water Week
From 22 until 26 June 2020, LIFE REWATCH project was present on the Innovative Water Week, organized by Water Europe. LIFE REWATCH had a virtual booth, where information of the project was showed (https://wie-2020.b2match.io/page-2591). Carlos Ramos, researcher from Eurecat and Coordinator of LIFE REWATCH, participated in virtual meetings, where networking..Read More
June 18

LIFE REWATCH prototype is fully operational and treats petrochemical wastewaters

LIFE REWATCH prototype is fully operational and treats petrochemical wastewaters
Currently, LIFE REWATCH project is running the prototype with the whole treatment train, including the following technologies: AnoxKaldnesTM moving bed biofilm reactor (MBBR), which is devoted to decrease the organic matter content of the petrochemical wastewater. Two aerobic reactor connected in series (23 m3 each) made on epoxy coated carbon..Read More
June 16

1st OPEN DAY REWATCH

1st OPEN DAY REWATCH
On June 16th the LIFE REWATCH project team hosted a virtual open day. The virtual seminar gathered three partners of the LIFE REWATCH project: Miquel Rovira (from Eurecat, coordinator of the project), Elisenda Taberna (from VWS, technology supplier of AnoxKaldnesTM MBRR and Actiflo® evaluated on REWATCH project) and David Arias..Read More
June 15

Review meeting with the monitor

The last 15 June 2020 took place the REWATCH review meeting. This was online, due to Covid-19. Representatives of all beneficiaris attended the meeting along with María José de la Torre, the NEEMO expert responsible of the LIFE project monitoring.    
March 1

Start-up of the pilot plant

Start-up of the pilot plant
Petrochemical industry is a great water consumer sector, producing wastewater with complex composition and at high volumes (around 1,750 millions of m3 per year). In order to introduce the circular economy concept into the petrochemical sector, LIFE-REWATCH project aims to demonstrate, at pilot scale, a technology available to treat and..Read More
2019
September 9

REWATCH LCA presented at the 9th International Conference on LCM

REWATCH LCA presented at the 9th International Conference on LCM
Last September 2019, REWATCH results from Life Cycle Analysis of the project prototype were presented at the 9th International Conference on Life Cycle Management LCM 2019 held in Poznan.  Joan Berzosa, researcher from Eurecat Manresa, was in charge of presenting the work. This year’s theme was Towards sustainable future, current..Read More
June 26

The REWATCH consortium meets with the NEEMO monitoring expert

The REWATCH consortium meets with the NEEMO monitoring expert
Last 25th of June 2019 took place the sixth review meeting at DOW North Petrochemical Complex in La Pobla de Mafumet, Tarragona Province, Spain. Representatives of all beneficiaries attended the meeting along with María José de la Torre, the NEEMO expert responsible of the LIFE project monitoring. The project consortium..Read More
June 16

REWATCH project presented at IWA Water Reuse

REWATCH project presented at IWA Water Reuse
Last 16-20 June, REWATCH Project was presented in 12th IWA International Conference on Water Reclamation and Reuse. Verónica Gómez, from Tarragona Global Water Technology Center and R&D Leader in DuPont Water Solutions, presented a poster and an oral presentation in the conference. Her talk was well received by the audience..Read More
March 11

REWATCH Project Meeting

REWATCH Project Meeting
Last 11th of March took place a technical meeting at DOW Chemical Ibérica facilities. Technical aspects of the prototype operation were discussed and currently great efforts are being done to start its operation in a very short time.
2018
December 4

REWATCH consortium meets in DOW for its fifth followup meeting

REWATCH consortium meets in DOW for its fifth followup meeting
Last 4th of December 2018 took place the fifth review meeting at DOW facilities in Tarragona. The project consortium reviewed the current status of the project, action by action and visited the REWATCH plant. Just finished the site adaptation and implementation of the prototype, main efforts are assigned to the..Read More
July 3

THE REWATCH PILOT PLANT ALREADY INSTALLED IN ITS FINAL LOCATION

THE REWATCH PILOT PLANT ALREADY INSTALLED IN ITS FINAL LOCATION
Beginning June 2018, the four containers with all water treatment technologies were moved to their final location within the DOW petrochemical complex. During this month, mechanical works and containers interconnections, the piping from and to the feed water inputs and the discharge trench, respectively, have been finished. The four units..Read More
June 15

THE REWATCH CONSORTIUM MEETS WITH THE NEEMO MONITORING EXPERT

THE REWATCH CONSORTIUM MEETS WITH THE NEEMO MONITORING EXPERT
The last 15 June 2018 took place a review meeting at DOW North Petrochemical Complex in La Pobla de Mafumet, Tarragona Province, Spain. Representatives of all beneficiaries attended the meeting along with María José de la Torre, the NEEMO expert responsible of the LIFE project monitoring. Just passed the halfway..Read More
April 16

REWATCH AT THE IWA YOUNG WATER PROFESSIONALS CONFERENCE IN CRANFIELD

REWATCH AT THE IWA YOUNG WATER PROFESSIONALS CONFERENCE IN CRANFIELD
Last April, REWATCH results from the MBBR tests performed at lab scale were presented at the 19th UK-IWA Young Water Professionals Conference held in Cranfield University (UK). The conference accounted for more than 200 attendees. This year’s theme was Towards a Resilient Water Future and included presentations from several topics such as..Read More
March 21

CONTAINERS WITH THE REWATCH TECHNOLOGY ALREADY IN TARRAGONA PETROCHEMICAL COMPLEX

CONTAINERS WITH THE REWATCH TECHNOLOGY ALREADY IN TARRAGONA PETROCHEMICAL COMPLEX
The modules containing the different technologies of the REWATCH solution, constructed by VEOLIA and JHUESA, are already in the petrochemical complex in Tarragona waiting to be moved to the final location of the pilot plant. Currently, great efforts are being done for the site adaptation in order to start the..Read More
March 13

REWATCH CONSORTIUM MEETS IN MANRESA FOR ITS THIRD FOLLOWUP MEETING

REWATCH CONSORTIUM MEETS IN MANRESA FOR ITS THIRD FOLLOWUP MEETING
The last 13 March 2018 took place the third review meeting at CTM facilities in Manresa. Just passed the halfway of the project, the project consortium reviewed the current status of the project, action by action. Currently, the main efforts are assigned to the site adaptation and implementation of the..Read More
2017
September 29

OPTIMIZATION AT BENCH-SCALE OF THE ION EXCHANGE RESINS

OPTIMIZATION AT BENCH-SCALE OF THE ION EXCHANGE RESINS
The water recycling scheme foreseen in the REWATCH project includes a final step using ion exchange resins aimed at removing trace ions. The aim of this polishing step after is achieve a water effluent fulfilling quality specifications for boiler feed water. Water demand for boilers accounts for the 8% of..Read More